Santa Rita East Wind Farm, Texas

  • Project Type

    Onshore wind farm

  • Project Location

    Reagan Country, Texas, US

  • Capacity

    300MW

  • Start of Construction

    December 2018

  • Start of Operations

    2019

  • Developer

    Invenergy

  • Turbine Supplier

    GE Renewable Energy

Santa Rita East wind farm is a 300MW onshore wind power project being developed 112km west of San Angelo in the Reagan Country, Texas, US.

The project is being developed by Invenergy, the biggest independent, privately-held renewable energy company in North America. Santa Rita East is the biggest wind project undertaken by Invenergy till date.

Invenergy completed financing for the wind farm in December 2018 and started construction in the same month.

Scheduled for commissioning in 2019, the project is expected to generate enough clean energy to power 102,500 US homes over its estimated initial operational life of 20 years.

The onshore wind project is expected to create 300 jobs during the construction phase and up to 15 permanent jobs during the operational phase.

Santa Rita East wind project financing and partnership details

Santander and Rabobank are the co-lead arrangers and issuing banks for the construction financing of the Santa Rita East wind project.

American Electric Power (AEP) will acquire 75% interest in the wind farm, after its completion, as part of a purchase and sale agreement signed with Invenergy in December 2018.

Retaining a 25% equity interest, Invenergy will continue to provide operations, asset management, and energy management services, under a 20-year deal.

Santa Rita East wind farm make-up

The Santa Rita East onshore wind farm will consist of 120 GE 2.5MW-116 turbines.

With 116m-diameter rotor and 56.9m-long blades, each turbine will have a swept area of 10,660m².

The hub-height and tip-height of the turbines will be up to 94m and 152m, respectively.

Designed to operate at 50Hz as well as 60Hz frequencies, each turbine will have a nominal generating capacity of 2.5MW.

The annual energy production (AEP) of a single GE 2.5MW-116 turbine operating at 8.0m/s wind speed is estimated to be 11,832MWh.

Power purchase agreements

Invenergy secured three power purchase agreements for 260MW of the Santa Rita East wind farm in 2018.

Grupo Bimbo, a Mexican multi-national baking company, signed a PPA for purchasing100MW of energy from the Santa Rita East wind farm, in April 2018.

Merck, a multi-national pharmaceutical company based in the US, also signed a PPA to off-take 60MW of power from the wind farm in April 2018. Schneider Electric Energy and Sustainability Services served as an advisor to Merck for finalizing the deal.

Novartis, a Swiss multi-national pharmaceutical company, signed a PPA for 100MW of the Santa Rita East wind farm in August 2018. Edison Energy was the advisor to Novartis for the 12-year agreement.

Contractors involved with the Santa Rita East wind farm

GE Renewable Energy was selected for supplying 120 GE 2.5MW-116 turbines for the Santa Rita East wind farm in May 2017.

Blattner Energy is responsible for the civil and mechanical construction works of the wind farm, while RES System 3 is the contractor for the electrical substation of the wind farm.