Barakah Nuclear Power Plant, Abu Dhabi

  • Project Type

    Nuclear power plant

  • Location

    Al Dhafra Region, Abu Dhabi, UAE

  • Capacity

    5.6GW

  • Start of Operation

    2020

  • Developers

    Emirates Nuclear Energy Corporation (ENEC) and Korea Electric Power Corporation (KEPCO)

  • Operator

    Nawah Energy Company

  • Estimated Investment

    $24.4bn

  • Key Contractors

    KEPCO, KHNP, Hyundai, Samsung, Doosan, Korea Power Engineering Company (KOPEC), Korea Nuclear Fuel (KNF), and Korea Plant Service and Engineering (KPS)

The 5.6GW Barakah nuclear power plant (NPP) is under construction in the Dhafra Region of Abu Dhabi. Barakah is the first nuclear power project in the United Arab Emirates (UAE) as well as in the entire Arab world.

The project is being jointly developed by Emirates Nuclear Energy Corporation (ENEC) and the reactor supplier Korea Electric Power Corporation (KEPCO). It is located approximately 53km west-southwest of the city of Ruwais.

Nawah Energy Company, a joint venture established between ENEC and KEPCO in 2016, will be responsible for the operation and maintenance of the NPP.

Construction on the $24.4bn nuclear power project started in July 2012. The first reactor unit of the planned four 1.4GW reactors was completed in May 2017, for which Nawah has completed comprehensive operational readiness review and awaits the operating license from UAE’s Federal Authority of Nuclear Regulation (FANR).

The main concrete works as well as heavy equipment lifting for the remaining three nuclear reactor units at the site were also completed by November 2018.

The first reactor unit is expected to be commissioned by 2020.

The nuclear power plant is expected to generate up to a quarter of UAE’s electricity needs, while offsetting more than 21 million tonnes of greenhouse emissions a year, when fully operational.

Barakah nuclear power plant development history

The site preparation license application for the Barakah NPP was submitted to FANR in April 2010. The official groundbreaking ceremony was held in March 2011.

ENEC applied for the construction license for units 1 and 2 in December 2010 and received approval for the same from FANR in July 2012.

The construction license application for units 3 and 4 was submitted in February 2013, which was approved in September 2014.

The operating license application (OLA) for units 1 and 2 was filed in March 2015, while that for units 3 and 4 was filed in May 2017.

Barakah nuclear reactor details

The Barakah nuclear power plant will be equipped with four APR1400 reactor units of 1,400MW gross electric capacity each.

APR1400 is an advanced pressurized water reactor (PWR) based on the well-proven Korean Standard Nuclear Power Plant (KSNP) design.

Developed by the Korean nuclear industry under the leadership of KEPCO, the APR1400  technology is based on the System 80+ design, which is certified by the US Nuclear Regulatory Commission (NRC).

The reactor is licensed by the Korea Institute of Nuclear Safety (KINS) and has an estimated operational lifespan of 60 years.

Electricity transmission

Electricity generated from the Barakah NPP will be evacuated and fed into the UAE grid by Abu Dhabi Transmission and Despatch Company (TRANSCO).

ENEC signed a connection and interface agreement for the same with TRANSCO in February 2016.

Barakah NPP financing

Financial closure for the $24.4bn nuclear power plant was achieved in October 2016. The project is being financed through 80% debt and 20% equity.

The debt financing comprises $16.2bn of direct loan from the Abu Dhabi government and a $2.5bn loan facility from the Export-Import Bank of Korea (KEXIM).

Contractors involved with the Barakah nuclear power plant

A consortium led by KEPCO was awarded a $20.4bn contract for the design, construction, and operation of four APR1400 reactor units at the Barakah NPP in December 2009.

The other members of the consortium include Korea Hydro & Nuclear Power (KHNP), Hyundai, Samsung, Doosan, Korea Power Engineering Company (KOPEC), Korea Nuclear Fuel (KNF), and Korea Plant Service and Engineering (KPS).

KHNP is responsible for the operating support services and co-operative businesses, while KEPCO Engineering & Construction (KEPCO E&C) was subcontracted for the plant design, architecture, and engineering works.

Bechtel was engaged to provide design and project management support services to KEPCO E&C.

Doosan is in charge of the construction and management of the nuclear steam supply system (NSSS), steam generator, and other related components.

Hyundai and Samsung were entrusted with the civil engineering works, while Westinghouse was subcontracted for providing technical assistance and license-related works.

The nuclear fuel for the Barakah NPP will be supplied by KNF and maintained by KPS.

Hilal Bil Badi and Partners Contracting (HILALCO), a local company, was awarded the engineering, procurement, and construction (EPC) contract for the critical water intake structures of the plant.

Other major local firms involved with the project include Emirates Steel, National Cement, Dubai Cable Company, National Marine Dredging Company, and Western Bainoona Group.

Nawah Energy signed a ten-year operation and maintenance (O&M) framework agreement with EDF for the Barakah NPP, in November 2018.