Compelo Energy is using cookies

We use them to give you the best experience. If you continue using our website, we'll assume that you are happy to receive all cookies on this website.

ContinueLearn More
Close
Dismiss

Table 1. Initial specification and sediment trapping characteristics of proposed lower Jinsha dam cascade

Wudongde (WDD) Baihetan (BHT) Xiluodu (XLD) Xiangjiaba (XJB)
Inflow I 108 m3/yr 1164 1312 1440 1440
Sediment load Sy 108 m3/yr 1.06 1.15 1.21 1.22
Total capacity T 108 m3 58.6 205.1 115.7 51.6
Adjustable capacity C 108 m3 26.2 104.4 64.6 9.0
Residence time C/I years 0.023 0.080 0.045 0.006
Trapping efficiency TE0 0.67 0.82 0.76 0.35