Table 2: Angolas hydro power schemes – existing and under construction

Power plant River/Basin Built Capacity (MW) Power production (GWh/year) Notes
Capanda Cuanza 2005/(07) 2×130 (2×130) 1300 (1800) Phase 1 just completed. Phase 2 online by 2007
Cambambe Cuanza 1962/73 4 x 45 900 Operational. For rehab
Mabubas Dande 1954/57 18 60 2 of 3 groups operational
Lomaum Catumbela 1964/73 35 160 Under rehabilitation
Biopio Catumbela 1957 14 50 Not operational. For rehab
Matala Cunene 1959 41 144 Rehabilitated (2001)
Chicapa Chicapa/Zaire (2007) 20 90 Under construction