Table 1: Installed hydro capacity on Ethiopia’s ICS power grid

Source: Ethiopian Electric Power Corporation (EEPCo).

Name of plant Generation (MW) Year of commission
Koka 43.2 1960
Awash II 32.0 1966
Awash III 32.0 1971
Finchaa 134.0 1973, 2003
Melka Wakana 153.0 1988
Tis Abay I 11.4 1964
Tis Abay II 73.0 2001
Gilgel Gibe 184.0 2004