Small hydro power stations under construction

Power station No of Machines x capacity (kW) Total installed capacity (MW) Likely date of commission Stream River valley District Design head (m) Design discharge (m3/sec) Turbine type
Asiganga-I 2 x 2250 4.5 July 2007 Asiganga Bhagirathi Uttarkashi 100 5.63 Francis, Horizontal shaft
Asiganga-II 2 x 1500 3 July 2007 Asiganga Bhagirathi Uttarkashi 61.83 5.63 Francis, Horizontal shaft
Sobla-I 2 x 4000 8 July 2007 Sobla Sharda Pithoragarh 196.51 4.62 Francis, Horizontal shaft
Asiganga-III 2 x 1500 3 Dec 2007 Asiganga Bhagirathi Uttarkashi 92.31 4.13 Francis, Horizontal shaft
Tankul 2 x 6000 12 June 2009 Shaborigad Sharda Pithoragarh 400 2.5 Pelton Wheel
Bhilangna-II 2 x 5500 11 June 2009 Bhilangna Bhagirathi Tehri 105 12.60 Francis, Horizontal shaft
Kaliganga-I 2 x 2000 4 June 2009 Kaliganga Mandakani Rudraprayag 166 3.30 Francis, Horizontal shaft
Kaliganga-II 2 x 2000 6 June 2009 Kaliganga Mandakani Rudraprayag 140 5.50 Francis, Horizontal shaft
Pilangad-II 2 x 2000 4 June 2010 Pilangad Bhagirathi Uttarkashi 195.6 2.75 Francis, Horizontal shaft
Suringad-II 2 x 1500 3 June 2010 Suringad Sharda Pithoragarh 352 1.22 Pelton, Horizontal shaft
Painagad 2 x 2000 4 June 2010 Painagad Bhagirathi Pithoragarh 216.4 2.45 Francis, Horizontal shaft
Kalsa 2 x 150 0.30 June 2010 Kalsa Sharda Nainital 122 0.34 Francis, Horizontal shaft
Urgam-II 2 x 1900 3.8 June 2010 Kalpganga Bhagirathi Chamoli 201 2.31 Francis, Horizontal shaft