Compelo Energy is using cookies

We use them to give you the best experience. If you continue using our website, we'll assume that you are happy to receive all cookies on this website.

ContinueLearn More
Close
Dismiss

Table 1: Closure laws for turbine load rejections

Group Case Initial head (m) Closing law Changeover point B
Opening y Corresponding time t (s) Opening time yb Opening time tb (s)
Group 1 in No 1 pumped storage No 1 0 3.8 16.3 3.8
No 2 555.4 1.0 0.5 0.008 0 5.0 16.3 0.5 5.0
No 3 0 6.0 16.3 6.0
Group 2 in No 1 pumped storage No 4 0 3.8 16.3 3.8
No 5 610.2 1.0 0.5 0. 008 0 5.0 16.3 0.5 5.0
No 6 0 6.0 16.3 6.0
Group 3 in No 2 pumped storage No 8 1.0 0.6 0.05 0 4.0 17.75 22.75 4.0
No 9 286.3 0.008 0 5.5 17.75 22.75 0.6 5.5
Group 4 in No 2 pumped storage No 10 1.0 0.6 0.05 0 4.0 17.75 22.75 4.0
No 11 265.9 0.008 0 5.5 17.75 22.75 0.6 5.5