EGATs hydro power plants

Remarks:
1 EGAT installed hydro power plants only while the dams owned by Royal Irrigation Department (RID)
2 Small hydro power plants with EGATs weir height <15m

Hydro power plant Location (province) No of units x (MW) Total capacity (MW)
Bhumibol Tak [5×76.3] + [1×70] + [1×115] + [1×171] 737.5
Srinagarind Kanchanaburi [3×120] + [2×180] 720
Sirikit Uttaradit 4×125 500
Khao Laem Kanchanaburi 3×100 300
Rajjaprapha Surat Thani 3×80 240
Pak Mun Ubol Ratchathani 4×34 136
Bang Lang Yala 3×24 72
Chulabhorn Chaiyaphum 2×20 40
Tha Thung Na Kanchanaburi 2×19 38
Sirindbhorn Ubol Ratchathani 3×12 36
Ubol Ratana Khon Kaen 3×8.4 25.2
Kaeng Krachan1 Phetchaburi 1×17.5 17.5
Mae Ngat1 Chiang Mai 2×4.5 9
Nam Pung Sakon Nakorn 2×3 6
Ban Santi2 Yala 1×1.275 1.275
Huai Kum Chaiyaphum 1×1.06 1.06
Ban Khun Klang2 Chiang Mai 2×0.09 0.18
Ban Yang2 Chiang Mai [2×0.056] + [1×0.0125] 0.125
Huai Kui Mang2 Kanchanaburi 1×0.1 0.1
Klong Chong
Klum2 Sa Kaeo 1×0.024 0.024
Total 2879.97